The challenge
The venue sat deep in the desert with no power or connectivity, daytime heat above 40°C, and an opening that needed 400 kW and a stable live stream.
The solution
Dual silent generators with automatic changeover and UPS units for the stage and broadcast, a backup satellite link alongside temporary fibre, and a full rehearsal 48 hours out on backup power alone.
The result
One 3-second mains outage, during which the UPS units kept the stage and the live stream running without interruption.